Overview
Every hydronic system starts its life dirty. Welding slag, cutting swarf, jointing compound, millscale and general construction debris are left behind in newly installed pipework as a matter of course, and if that debris isn't removed before a system is filled, dosed and put into service, it becomes the root cause of the failures that show up months or years later: blocked strainers, seized valves, eroded pump impellers, fouled heat exchangers and premature corrosion.
ProMech Group delivers BG29 compliant pipeline flushing and commissioning across London, the South East, Dublin and the wider UK & Ireland region, engineered specifically for chilled water, low temperature hot water (LTHW), condenser water and process pipework systems in mission critical environments, data centres, pharmaceutical facilities, commercial office plant rooms and industrial sites. Our flushing programmes are designed around BSRIA BG29 guidance, verified by measured circulation velocities rather than guesswork, and handed over with full documentation your commissioning engineer, consultant, and eventually your insurer, will actually want to see.

Our Process
- 1
Pre flush survey and method statement
Before any water moves, we survey system layout, identify isolation points, strainer locations and low velocity risks.
- 2
Circulation velocity flushing
We use temporary pumping equipment to achieve and sustain BSRIA BG29 minimum velocities across all pipe diameters.
- 3
Debris removal and strainer monitoring
Temporary strainers are fitted and logged at regular intervals to objectively verify system cleanliness.
- 4
Chemical cleaning where required
Degreasing and dispersant agents appropriate to system metallurgy are applied and thoroughly rinsed.
- 5
Passivation and inhibitor dosing
Dosing corrosion inhibitor and biocide to establish protective internal passivating layers.
- 6
Verification and commissioning
Water sampling for suspended solids, iron content, and pH, logging flow rates against design values.
- 7
Documentation and handover
Compliance certification referencing BSRIA BG29, flushing logs, and audit ready test records.
Standards & Compliance
- BSRIA BG29, UK pre commission cleaning standard
- CIBSE Code W, Water distribution systems
- ASHRAE guidelines, System cleanliness
- CDM 2015 site safety protocols
Industries We Serve
- Data centres, Hyperscale and colocation
- Pharmaceutical, Sterile process plants
- Commercial Office, LTHW & Chilled water
- Industrial Sites, Utility pipework