Overview

Every hydronic system starts its life dirty. Welding slag, cutting swarf, jointing compound, millscale and general construction debris are left behind in newly installed pipework as a matter of course, and if that debris isn't removed before a system is filled, dosed and put into service, it becomes the root cause of the failures that show up months or years later: blocked strainers, seized valves, eroded pump impellers, fouled heat exchangers and premature corrosion.

ProMech Group delivers BG29 compliant pipeline flushing and commissioning across London, the South East, Dublin and the wider UK & Ireland region, engineered specifically for chilled water, low temperature hot water (LTHW), condenser water and process pipework systems in mission critical environments, data centres, pharmaceutical facilities, commercial office plant rooms and industrial sites. Our flushing programmes are designed around BSRIA BG29 guidance, verified by measured circulation velocities rather than guesswork, and handed over with full documentation your commissioning engineer, consultant, and eventually your insurer, will actually want to see.

Large flanged pipeline and refinery process columns on a plant structure

Our Process

  1. 1

    Pre flush survey and method statement

    Before any water moves, we survey system layout, identify isolation points, strainer locations and low velocity risks.

  2. 2

    Circulation velocity flushing

    We use temporary pumping equipment to achieve and sustain BSRIA BG29 minimum velocities across all pipe diameters.

  3. 3

    Debris removal and strainer monitoring

    Temporary strainers are fitted and logged at regular intervals to objectively verify system cleanliness.

  4. 4

    Chemical cleaning where required

    Degreasing and dispersant agents appropriate to system metallurgy are applied and thoroughly rinsed.

  5. 5

    Passivation and inhibitor dosing

    Dosing corrosion inhibitor and biocide to establish protective internal passivating layers.

  6. 6

    Verification and commissioning

    Water sampling for suspended solids, iron content, and pH, logging flow rates against design values.

  7. 7

    Documentation and handover

    Compliance certification referencing BSRIA BG29, flushing logs, and audit ready test records.

Standards & Compliance

  • BSRIA BG29, UK pre commission cleaning standard
  • CIBSE Code W, Water distribution systems
  • ASHRAE guidelines, System cleanliness
  • CDM 2015 site safety protocols

Industries We Serve

  • Data centres, Hyperscale and colocation
  • Pharmaceutical, Sterile process plants
  • Commercial Office, LTHW & Chilled water
  • Industrial Sites, Utility pipework

Related Services & Regions

Contact Us

Talk to a ProMech engineer about your project. Enquiries are answered within one working day.

Promech Group

Our service area

Send an Enquiry

No file selected

Larger tender packs: email info@promech.group.

By submitting, you agree to our privacy policy. We use your details only to respond to your enquiry.

Ready to Specify Your Flushing Programme?

Talk to a ProMech engineer about scope, standards and delivery. We respond within one working day.

Request a Quote