Data CentresWest Dublin, IE

Hyperscale chilled water flushing programme, 48 MW build

Scope: BG29 pre commission cleaning of primary and secondary chilled water loops.

Outcome: Submicron particulate achieved. Handed over on programme with zero snag list.

48 MW
IT load supported
PharmaceuticalCork, IE

Sterile process water commissioning, new API facility

Scope: Passivation, riboflavin verification and IST for WFI and PW loops.

Outcome: GMP validation pack accepted first time by regulator.

100%
IQ/OQ first time pass
Data CentresSlough, UK

Live plant remediation of cooling headers

Scope: In service diagnosis and chemical remediation without downtime.

Outcome: Cooling capacity restored to design intent. Continuous operation maintained.

0
Minutes of downtime
Oil & GasNorth Sea Terminal, UK

Turnaround pipeline pressure test campaign

Scope: Multi loop hydrotest to PED with witnessed integrity sign off.

Outcome: Turnaround completed 36 hours ahead of critical path.

36h
Ahead of critical path
CommercialCentral London, UK

Grade A office LTHW commissioning

Scope: Full BG29 flushing, chemistry commissioning and system balance.

Outcome: Delivered to tenant handover with full compliance pack.

24
Floor plates commissioned
PharmaceuticalDublin, IE

Geothermal loop remediation & recharge

Scope: Underperforming ground source array: full purge, reglycol and recommission.

Outcome: Heat transfer performance restored to design curve.

+38%
Loop efficiency gained