Hyperscale chilled water flushing programme, 48 MW build
Scope: BG29 pre commission cleaning of primary and secondary chilled water loops.
Outcome: Submicron particulate achieved. Handed over on programme with zero snag list.
Case Studies
Selected programmes. Commercial detail withheld under NDA. Talk to us for detailed references.
Scope: BG29 pre commission cleaning of primary and secondary chilled water loops.
Outcome: Submicron particulate achieved. Handed over on programme with zero snag list.
Scope: Passivation, riboflavin verification and IST for WFI and PW loops.
Outcome: GMP validation pack accepted first time by regulator.
Scope: In service diagnosis and chemical remediation without downtime.
Outcome: Cooling capacity restored to design intent. Continuous operation maintained.
Scope: Multi loop hydrotest to PED with witnessed integrity sign off.
Outcome: Turnaround completed 36 hours ahead of critical path.
Scope: Full BG29 flushing, chemistry commissioning and system balance.
Outcome: Delivered to tenant handover with full compliance pack.
Scope: Underperforming ground source array: full purge, reglycol and recommission.
Outcome: Heat transfer performance restored to design curve.
We'll share detailed references relevant to your sector and scope under mutual NDA.